AI-Ready Infrastructure for the Next Generation of Compute Greater Tokyo, Japan
AI-Ready Greater Tokyo Data Center Campus
ZEUS TYO 1 is a greenfield data center campus strategically located in Zama, Kanagawa, within the Greater Tokyo market, designed to support next-generation AI, cloud and high-density computing workloads.
With 42 MW of secured power capacity, liquid-cooling-ready infrastructure and carrier-neutral connectivity, ZEUS TYO 1 provides a scalable platform for high-performance digital infrastructure deployment in one of Asia’s most established data center markets.
| Location | Zama, Kanagawa, Greater Tokyo, Japan |
| Development Type | Greenfield Data Center Campus |
| Secured Power Capacity | 42 MW |
| IT Capacity | Up to 70 MW phased IT deployment |
| Land Area | Approx. 9,917 sqm |
| Development Status | Planned Development |
| RFS Target | Q2 2031 |
| Design Standard | Tier III |
| Rack Density | 12 kW – 150 kW / rack |
| Cooling Capability | Air & Liquid Cooling Ready |
| Connectivity | Carrier-neutral infrastructure |
-
Strategic Greater Tokyo Location
Located in Zama, Kanagawa, within the Greater Tokyo market
Positioned within one of Asia’s most established digital infrastructure ecosystems
Provides an alternative deployment location beyond central Tokyo
-
AI & High-Density Ready Infrastructure
InfrastructureDesigned for next-generation AI and HPC workloads
Supports both air-cooled and liquid-cooled environments
Flexible infrastructure designed for evolving compute requirements
-
Large-Scale Scalable Capacity
42 MW of secured power capacity
Greenfield development enabling purpose-built infrastructure
Designed to support scalable cloud and AI deployments
-
42MW+Secured Power
-
9,917 sqmLand Area
-
Carrier NeutralDiverse Fiber Ecosystem
-
Tier IIIMission-Critical Design
Speak with our team about capacity availability, power reservations, and phased deployment timelines at ZEUSTYO 1.
