Powering the Next Generation of AI Infrastructure in Japan Osaka, Japan
-
100MWSecured Power Capacity
-
70MWAI-READY IT LOAD
-
Q1 2028Target RFS
AI-Ready Hyperscale Data Center Campus
ZEUS OSA 1 is a next-generation data center campus located in Osaka, Japan, designed to support hyperscale, artificial intelligence (AI), and high-performance computing (HPC) workloads.
With secured power capacity, flexible high-density deployment capability, and carrier-neutral connectivity, ZEUS OSA 1 provides a scalable platform for next-generation digital infrastructure requirements.
| Location | Osaka, Japan |
| Development Type | Greenfield Data Center Campus |
| Secured Power Capacity | 100 MW |
| IT Capacity | Up to 70 MW phased IT deployment |
| Land Area | Approx. 13,957 sqm |
| Development Status | Under Development |
| RFS Target | Q1 2028 |
| Design Standard | Tier III |
| Rack Density | 12 kW – 150 kW / rack |
| Cooling Capability | Air-cooled & liquid-cooled |
| Connectivity | Carrier-neutral infrastructure |
Built for the workloads
reshaping AI infrastructure
-
Strategic Osaka Location
Located in one of Japan's key digital infrastructure markets
Provides an alternative deployment hub beyond Tokyo
Access to established connectivity ecosystems
-
AI & High-Density Ready
InfrastructureDesigned for next-generation AI and HPC workloads
Supports flexible rack density requirements
Liquid cooling capable architecture
-
Large-Scale Scalable Capacity
Significant secured power availability
Phased deployment model supporting future expansion
Suitable for hyperscale and AI cloud customers
-
100MW+Secured Power
-
12–150kW/rackAI Compute Ready
-
Carrier NeutralDiverse Fiber Ecosystem
-
Tier IIIMission-Critical Design
Speak with our team about capacity availability, power reservations, and phased deployment timelines at ZEUS OSA 1.
